Skip to Content

Building Code Compliance Inspections & Designs

When conditions at the site or other circumstances exceed the prescribed limits of the state regulations, we engineer the designs that make manufactured buildings safe and durable.

Weather and other circumstances permitting, we perform foundation inspections and send the report within three days after we receive the order.

Be sure to include driving instructions or a map that directs our technician to the site

Also, be sure to read the HUD requirements before you place your order.

Click here for an inspection order form that you can print and FAX back for manufactured housing foundation inspection.

This information is provided as a courtesy to help illustrate some of the H.U.D. Permanent Foundation requirements that apply in our local area. This list does not purport to be a complete manual of accepted good practice.

Other building code and engineering considerations may apply to various situations. Meeting the requirements listed above does not assure that the installation can be certified. However, the installation will not be approved unless all the above details are provided.

 

Call (513) 474-9600 for more information.